This video shows the 500M dismantling wind farm Lely in the Netherlands. It was built 1992 and was approaching the end of its life cycle. Four piles each 26m long and with a diameter of 3.20 to 3.70m were removed one by one from the seabed and carried off via pontoons. The piles were extracted in only 45 minutes each. The PVE 500M has proven once again to have the power to extract 70 to 80 tons piles without any problems.