VIDEO
815C bore pile installation
2017-11-10    by : admin


Bore piles are a signature application for ICE hammers. In this movie we show the 815C at work driving 15m long 800mm diameter casings as part of the bore pile process. The casing is driven by vibratory hammer then an auger empties the casing a steel cage is lowered into the bore hole and concrete is poured in. After a settling period the casing is extracted by vibratory hammer. During the extraction process the concrete is densified by the vibrations.