Wet versus Dry excavation methods
2017-10-18 15:28    by : Arjen
  • Wet versus Dry excavation methods

In 2013 construction of an underground parking garage was started in Den Bosch a medium sized city in the Netherlands. The subterranean garage which measures 275 by 35meters has 3 parking levels and required excavation to 14m depth. In total 140.000 cubic meters of soil had to be removed from the site with reduced impact to the surroundings.

相关新闻
是否想
询问我更多问题?
我很高兴为您解答
艾严
执行总裁
现在就联系我
021-34688990
  • 上海艾西伊建筑设备贸易有限公司
  • 电话:  (86) 21 3468 8990
  • 传真:  (86) 21 3468 8901
  • 电子邮件:icevibro@icevibro.com
  • 网站地址:www.icevibro.com
  • 办公地址:上海艾西伊建筑设备贸易有限公司
  •      上海市浦东新区川沙路6999号
  •      川沙国际精工园31幢厂房 (B8)
  • 邮编:  201202
扫一扫 获取最新信息

沪公网安备 31011502008669号


沪ICP备19006476号